B Tech:Update: Presentations by Group 7 & 8

The presentation of group 8 will start at 2:35 pm and that of Group 7 will place at ~ 3:00 pm on Mar 1. The location will be room# 104.

Saturday, 25 February 2017

B Tech: Test# 3 during the week of Feb 27-Mar 3

Test# 3 will take place during the regular tutorial hours during the week of Feb 27-Mar 3. The syllabus for section A is the entire unit on Suspended Growth Systems, while for Sec-B, the syllabus is limited to everything up to (and including) ASP.

Thursday, 23 February 2017

B Tech: Project presentations of Groups 7 & 8 on March 1

Groups 7 & 8 will make presentations on their assigned topics on Wednesday, Mar 1, lec#8 in room#104.

M Tech: Term Paper submissions

It has been observed that very few students are submitting the assignments for the Term Paper course. This week all the students (from both Env. Engg. and Construction Mgmt.) are supposed to submit the Literature Review section. This should have been preceded by Introduction Section, Abstract, Hypothesis selection.

Late submissions not only carry penalty but may or may not be evaluated in-depth.


It is strongly suggested that you stick to the deadlines.

M Tech: Env Engg: MIE presentations on March 2

The assignment presentations for the Mgmt. of Ind. Effluents course will take place during the lecture hours on Thursday, March 2. You will also be required to submit a well-referenced group project report along with your presentation.


B Tech: Secondary treatment-suspended growth system slides

Secondary treatment-suspended growth system slides

Thursday, 16 February 2017

B Tech: Project group changes for grp. 13 & 14

Shehroze will join group#13 and Adarsh Jha will join Group# 14 for their projects of CVL404.