This is the official Blog for all the courses taught by Prof. (Dr.) Gaurav Saini. Assignments, quizzes, attendance, notices and any other information for his courses will be posted here. This term (Odd Semester, 2020-2021), Dr. Gaurav is teaching Environmental Engineering-2, Environmental Chemistry & Biotechnology, and Renewable Energy Technologies.
Thursday, 27 November 2014
B Tech: Tech seminar presentations
The students who missed out on their regular presentation schedule can make their presentations on Nov 28 between 9 am-10 am, at a suitable grade deduction. I may be available again at around 2 pm, however my other duties may supersede the presentations in the afternoon.
Visit to STP, Kasana on Nov 28
The trip to 137 MLD STP is scheduled for Friday, Nov 28 from 10 am.
It is mandatory for M Tech (EE) students.
There would be around 15 seats available for B Tech 4th yr students. If you would like to visit the STP, meet me in the Dept. at 10 am. More seats may be available but are not guaranteed.
It is mandatory for M Tech (EE) students.
There would be around 15 seats available for B Tech 4th yr students. If you would like to visit the STP, meet me in the Dept. at 10 am. More seats may be available but are not guaranteed.
Wednesday, 26 November 2014
Monday, 24 November 2014
Wednesday, 19 November 2014
STP visit postponed to next week
The planned visit to the G. Noida STP has been postponed till next week.
More details will be shared once visit is completely finalized.
More details will be shared once visit is completely finalized.
B Tech: 4 C G1: Tech Seminar Presentation Schedule
Fri, Nov 21: Roll No. 62, 68, 71, 72, 73, 76, 77
Mon, Nov 24: Roll No. 78, 79, 80, 81, 82, 85, 123
Thursday, Nov 27: Roll No. 124, 125, 127, 128, 129
Make sure that all the presentations for a given day are on the same computer, so that time is not wasted in change-over.
Mon, Nov 24: Roll No. 78, 79, 80, 81, 82, 85, 123
Thursday, Nov 27: Roll No. 124, 125, 127, 128, 129
Make sure that all the presentations for a given day are on the same computer, so that time is not wasted in change-over.
Tuesday, 18 November 2014
B Tech & M Tech: Visit to 137 MLD STP in G. Noida, Nov 20
I will be organizing a trip to the 137 MLD STP in Kasna on Nov 20.
All the M Tech students have to attend it.
10-12 B Tech students may also accompany us. All the interested B Tech final year students may contact me. However, only 10-12 may be accommodated.
All the M Tech students have to attend it.
10-12 B Tech students may also accompany us. All the interested B Tech final year students may contact me. However, only 10-12 may be accommodated.
Friday, 14 November 2014
M Tech: W & WWT Project assignment
Due Date: Friday, Nov 21 (during lecture class)
Submit your reflection on the water supply, water quality and sanitation conditions in India or any other developing country, you are resident of. Also comment on the awareness level and willingness of people to adopt safer and healthier options like sewers and treated drinking water. Suggest ideas to improve the WASH (water supply and hygiene) level of residents of developing countries. You may want to go through the following literature for some ideas.
You may also want to utilize your own data collected through WASH survey.
Max. Length of assignment: 5 A4 pages.
Only Handwritten reports will be accepted.
Relevant literature:
http://apps.who.int/iris/bitstream/10665/81245/1/9789241505390_eng.pdf
http://planningcommission.nic.in/reports/genrep/wtrsani.pdf
Submit your reflection on the water supply, water quality and sanitation conditions in India or any other developing country, you are resident of. Also comment on the awareness level and willingness of people to adopt safer and healthier options like sewers and treated drinking water. Suggest ideas to improve the WASH (water supply and hygiene) level of residents of developing countries. You may want to go through the following literature for some ideas.
You may also want to utilize your own data collected through WASH survey.
Max. Length of assignment: 5 A4 pages.
Only Handwritten reports will be accepted.
Relevant literature:
http://apps.who.int/iris/bitstream/10665/81245/1/9789241505390_eng.pdf
http://planningcommission.nic.in/reports/genrep/wtrsani.pdf
B Tech: Project Assignment
Due Date: Friday, Nov 21 (during lecture class)
Submit your reflection on the water supply, water quality and sanitation conditions in India or any other developing country, you are resident of. Also comment on the awareness level and willingness of people to adopt safer and healthier options like sewers and treated drinking water. Suggest ideas to improve the WASH (water supply and hygiene) level of residents of developing countries. You may want to go through the following literature for some ideas.
You may also want to utilize your own data collected through WASH survey.
Max. Length of assignment: 5 A4 pages.
Only Handwritten reports will be accepted.
Relevant literature:
http://apps.who.int/iris/bitstream/10665/81245/1/9789241505390_eng.pdf
http://planningcommission.nic.in/reports/genrep/wtrsani.pdf
Submit your reflection on the water supply, water quality and sanitation conditions in India or any other developing country, you are resident of. Also comment on the awareness level and willingness of people to adopt safer and healthier options like sewers and treated drinking water. Suggest ideas to improve the WASH (water supply and hygiene) level of residents of developing countries. You may want to go through the following literature for some ideas.
You may also want to utilize your own data collected through WASH survey.
Max. Length of assignment: 5 A4 pages.
Only Handwritten reports will be accepted.
Relevant literature:
http://apps.who.int/iris/bitstream/10665/81245/1/9789241505390_eng.pdf
http://planningcommission.nic.in/reports/genrep/wtrsani.pdf
M Tech: RET assignment on Stand-Alone PV system design
Due Date: Nov 17, during class lecture
Design the various components of a Stand-Alone PV system for a household that has the following load requirements:
4 bulbs, 40 W (DC) capacity for 4 hrs/day
2 fans, 120 W (AC) capacity for 6 hrs/day
1 TV, 200 W (AC) capacity, 3 hrs/day
1 washing machine, 350 W (AC) capacity, 1 hr/day
1 Refrigerator, 125 W (AC) capacity, 24 hrs/day
The system needs to have 2 days of autonomy. The average sun-shine hours are 4.9/day.
The standard configurations of various components can be taken the same as discussed in class.
Design the various components of a Stand-Alone PV system for a household that has the following load requirements:
4 bulbs, 40 W (DC) capacity for 4 hrs/day
2 fans, 120 W (AC) capacity for 6 hrs/day
1 TV, 200 W (AC) capacity, 3 hrs/day
1 washing machine, 350 W (AC) capacity, 1 hr/day
1 Refrigerator, 125 W (AC) capacity, 24 hrs/day
The system needs to have 2 days of autonomy. The average sun-shine hours are 4.9/day.
The standard configurations of various components can be taken the same as discussed in class.
B Tech: Technical Seminar Presentation schedule
Date: Nov 17, 2nd lecture (EEII course lecture)
The following students will make a presentation of about 4-5 minutes about their respective Tech. Seminar topics.
Roll NO.: 110107053-61
The following students will make a presentation of about 4-5 minutes about their respective Tech. Seminar topics.
Roll NO.: 110107053-61
Thursday, 13 November 2014
Wednesday, 12 November 2014
M Tech and B Tech: Seminar on Membrane Technology this Saturday
There is an interesting seminar by Prof. BB Gupta this saturday, SET III 102 from 9:30-10:30 am. The topic is "Membrane Technology" and is highly relevant to Wastewater treatment and Env. Biotechnology.
You are all suggested to attend it.
For M Tech students, submit a 1-page summary of the talk, along with suggestions for improvement. This is an assignment for Env. Biotech. course.
For B Tech students, submit a 1-page summary of the talk, along with suggestions for improvement. This assignment counts for Bonus marks towards the CA.
You are all suggested to attend it.
For M Tech students, submit a 1-page summary of the talk, along with suggestions for improvement. This is an assignment for Env. Biotech. course.
For B Tech students, submit a 1-page summary of the talk, along with suggestions for improvement. This assignment counts for Bonus marks towards the CA.
Friday, 7 November 2014
B Tech: Test topic for next week
The test will be conducted from Suspended Growth Systems, during th tutorial hours.
M Tech: W WWT test schedule
W WWT test will take place on Tuesday, Nov 11 and the topic will be Suspended Growth Systems.
Tuesday, 4 November 2014
M Tech: Spring Batch: Dissertation selection
The students of M Tech (Spring Batch) are required to decide on a broad research area of their interest (within the various sub-disciplines of env. engg.) and discuss it with the Program Coordinator, Dr. Gaurav Saini by Nov 14. They may also discuss the topics with other faculty members.
The approved topic and advisor's name need to be submitted to the HoD (Civil Engg.) by Nov. 25. Late submissions may not be allowed.
The approved topic and advisor's name need to be submitted to the HoD (Civil Engg.) by Nov. 25. Late submissions may not be allowed.
Thursday, 30 October 2014
Wednesday, 15 October 2014
Tuesday, 14 October 2014
Sunday, 12 October 2014
B Tech: Course Project data status update
Here is the status of data submission till date:
PRAMOD KUMAR SAH/110107136 | 8 |
Pankjesh sahni ,110107129 | 1 |
Halimatou Bah/110107072 | 3 |
nikhil sharma : 110107124 | 10 |
Kaddijatou Fofana 110108021 | 3 |
PAVAN KUMAR VARSHNEY (110107132) | 8 |
suresh sah | 3 |
Nilesh kumar verma (110107125) | 8 |
praveen kr mishra(110107139) | 8 |
Shambhu Sah(120107813) | 6 |
Parti Maya Rai (110107130) | 7 |
sudhanshu chaturvedi | 1 |
KAVIN PRASATH R | 4 |
Puneet Gupta | 1 |
Nikhil kr pandey - 110107123 | 4 |
Tshering Dendup | 4 |
Sonam choden | 1 |
Karma Dupchen | 1 |
It is surprising that even after multiple reminders, only some of you have participated in the project work. To remind you again, each of you have to submit at least 10 datasets (per student), failing which the data will be inconsequential for further work and your class project.
I am setting a deadline of Oct 30 for data submission, after which no extensions will be provided and students failing to submit requisite data contribution will be excluded from the course project.
M Tech: W & WWT course project data status
Here is the status of data submission till date:
Jamil Danlami Muhammad | 1 |
Umar Muhammad Bello | 5 |
SUNUSI IDRIS | 4 |
Swati Srivastava | 5 |
amrit kumar | 5 |
shishir kant mishra | 5 |
abhay singh | 4 |
Lukman Aliyu | 2 |
Syed Mohsn Shabir | 2 |
Mohammad Asim ul amin | 1 |
It is surprising that even after multiple reminders, only some of you have participated in the project work. To remind you again, each of you have to submit at least 10 datasets (per student), failing which the data will be inconsequential for further work and your class project.
I am setting a deadline of Oct 30 for data submission, after which no extensions will be provided and students failing to submit requisite data contribution will be excluded from the course project.
B Tech: Tut test syllabus
This week's tutorial sessions will include test on "Primary Treatment" (Excluding Reactors).
Good luck.
Good luck.
M Tech Assignment: RET article
Kindly go through the article titled "Enhancing renewable energy in India's Electricity Mix: A Paradigm Shift", recently published in TerraGreen by TERI..
The assignment involves following sections:
1. Discuss the authors' recommendations on increasing the fraction of RET in India's energy requirements. (Max length: 1 A4 sheet)
2. Do you agree or disagree with Authors' recommendations or any other aspect mentioned in the article? Can you suggest further recommendations to support or refute the authors' take on RET in India? (Max length: 1 A4 sheet)
The due date is Friday, Oct 17.
The assignment involves following sections:
1. Discuss the authors' recommendations on increasing the fraction of RET in India's energy requirements. (Max length: 1 A4 sheet)
2. Do you agree or disagree with Authors' recommendations or any other aspect mentioned in the article? Can you suggest further recommendations to support or refute the authors' take on RET in India? (Max length: 1 A4 sheet)
The due date is Friday, Oct 17.
Friday, 10 October 2014
Wednesday, 8 October 2014
B Tech: Tutorial for G2 on Friday, Lec-1 (at 9:00 am)
Group G2 will attend the tutorial on Friday, Oct 10 at 9:00 am in Room No. 304.
The test will cover Reactors.
The test will cover Reactors.
Sunday, 28 September 2014
B Tech: Extra class on Wed, Oct 1
I will be taking an extra class on Wednesday, Lecture #8 in room no. 303 SET II.
M Tech: Extra Classes
I will be taking some extra classes on the following dates as per the given schedule:
Sep 30: Lec 5
Oct 1: Lec 1 and Lec 4
All the classes will take place in Room No. 401, SET II.
Sep 30: Lec 5
Oct 1: Lec 1 and Lec 4
All the classes will take place in Room No. 401, SET II.
Friday, 26 September 2014
M Tech: Missing of extra class on Friday, Sep 26
It is really unfortunate that none of the students showed up for the extra class scheduled for Sep 26. The class was scheduled and informed to everyone 1 day in advance and also the morning of Sep 26. I received intimation only from Spring batch about their inability to attend the class.
I waited in class for 20 minutes. The extra classes are for your benefit only and such apathy on your part will only delay the course coverage. As such, I am assuming the current topic (planned for the class) finished.
I waited in class for 20 minutes. The extra classes are for your benefit only and such apathy on your part will only delay the course coverage. As such, I am assuming the current topic (planned for the class) finished.
M Tech: Attendance till Sept 15
You can find your subject wise attendance, compiled till Sep 15, here.
Be advised that attendance below 75% will affect your ability to participate in the end-term examination.
Be advised that attendance below 75% will affect your ability to participate in the end-term examination.
Monday, 22 September 2014
Wednesday, 17 September 2014
Thursday, 11 September 2014
M Tech: RET assignment: Seminar by Prof. B Bhattacharya on Sep 20
All the students are required to attend the lecture by Prof. B. Bhattacharya on "Dye-Sensitized Solar Cells" on Sat, Sep 20.
The venue and timing has already been mentioned to you by Dr. Prabhas.
You are also required to submit a 1-page (~ 400 words) report consisting of what you liked about the talk/content, what you learnt, what portion of talk is relevant/similar to something covered in RET course and what other information could have been included by the Speaker to make the talk more interesting.
The submission deadline is Mon, Sep 22.
The venue and timing has already been mentioned to you by Dr. Prabhas.
You are also required to submit a 1-page (~ 400 words) report consisting of what you liked about the talk/content, what you learnt, what portion of talk is relevant/similar to something covered in RET course and what other information could have been included by the Speaker to make the talk more interesting.
The submission deadline is Mon, Sep 22.
M Tech: Disciplinary Action: Copying issue in Water & WWT assignment
The assignments submitted by the following students for Water & Wastewater Treatment course are verbatim copies of each other.
1) Saifullah
2) Asim
3) Lukman
4) Shabir
5) Shishir
6) Umar
All of these students need to submit a signed written statement explaining this and also a written pledge that they will not commit this mistake again during their M Tech duration at Sharda University.
1) Saifullah
2) Asim
3) Lukman
4) Shabir
5) Shishir
6) Umar
All of these students need to submit a signed written statement explaining this and also a written pledge that they will not commit this mistake again during their M Tech duration at Sharda University.
M Tech: RET: Practice Questions
We discussed these questions in today's class. Try them today, we will discuss them in more details on Friday, Sep 12.
1. Q:
1. Q:
Country
|
Area (km2)
|
Sun hours per day
|
Energy Consumption (MWh/year)
|
United States
|
9,826,675
|
4
|
3,886,400,000
|
India
|
3,287,263
|
5
|
959,070,000
|
Brazil
|
8,515,767
|
4.5
|
455,700,000
|
Spain
|
505,992
|
4.5
|
267,500,000
|
UK
|
243,610
|
2.5
|
344,700,000
|
n(a) Determine which countries need to cover Maximum and minimum surface area to achieve total energy requirements from PV. Assume the PV efficiency is 15%.
n
(b) If a PV of 270 Wp is to be installed, what would be the most ideal location in term of maximum output.
2. Q:
nFamily Smith is interested in buying a solar energy system. After some research on the Internet they have found two different systems that they are considering. System A is a PV system based on multicrystalline silicon solar cells and system B is a PV system based on amorphous silicon solar cells.
nSystem A: The efficiency of the multicrystalline silicon module amounts to 15%. The dimensions of the solar module are 0.5m by 1.0m. Each module has an output of 75 Wp. The modules cost €60 each.
nSystem B: The amorphous silicon solar modules have an efficiency of 6%. The dimensions of the solar modules amount to 0.5m by 1.0m. The output of each module is 30 Wp. The modules cost €20 each. The advantage of the amorphous silicon solar modules is that they perform better on cloudy days in which there is no direct sunlight. Installed in the Netherlands, this system gives, on a yearly basis, 10% more output per installed Wp than the multicrystalline silicon modules.
nBoth systems are grid-connected using a 900 Wp inverter. The total price of the inverter, the cables, the installation and other costs amounts to €1000. The solar modules are to be installed on a shed. The roof of the shed can only support 10 m² of solar modules.
nIn the Netherlands a PV system having multicrystalline silicon module generates on average 850 Wh per Wp in one year. The performance of both types of modules is guaranteed for 20 years. The price of electricity from the grid is €0.23/kWh. Assume that all the power produced by the PV system is completely consumed by the Smith family.
na) How much (peak) power (in Wp) can be installed for system A given the peak power of the inverter and the area available on the shed? How about System B?
nb) What is the price of a kWh of electricity (in €/kWh) generated by system A? System B?
nc) Family Smith is eligible for a municipal subsidy for sustainable energy that amounts to 15% of the initial costs of the PV system. Using this subsidy, how many years does system A need to be operational to earn the own investment back (assume that the electricity price of €0.23/kWh does not change)? Calculate the same for system B.
Wednesday, 10 September 2014
M Tech: W & WWT Assignment#2
Due Date: Mon, Sep 15
Keep the answer brief and succinct, maximum 1-side of an A-4 sheet.
Q.: Why is the particle settling in a sedimentation tank independent of its depth?
Keep the answer brief and succinct, maximum 1-side of an A-4 sheet.
Q.: Why is the particle settling in a sedimentation tank independent of its depth?
Wednesday, 3 September 2014
M Tech: RET Assignment #1
n
In groups of 3, figure out the following for 1 RE option:
Deadline: Sep 8
n
1. The installed capacity patterns for last 3-4 decades and projected patterns for next 2-3 decades
n2. Top 5 countries with maximum increase in RE option in past 2 decades and future 2 decades.
n
nIn groups of 2, figure out
n1. What fraction of India’s installed capacity is delivered by Coal, Gas, Diesel, Nuclear, hydropower, Wind Power, Solar power and Bioenergy.
n2. Future projected fractions (2020 & 2050)
Monday, 1 September 2014
Monday, 25 August 2014
Thursday, 21 August 2014
Thursday, 3 July 2014
Thursday, 24 April 2014
Wednesday, 23 April 2014
Thursday, 17 April 2014
B Tech: Project report submission on Apr 22, Tuesday
The project report submission deadline is Tuesday, April 22, 2014.
Wednesday, 16 April 2014
Saturday, 12 April 2014
Wednesday, 9 April 2014
Tuesday, 8 April 2014
Format for B Tech project reports
Here is the format for project reports. The due date is April 22.
The maximum page limit is 20 pages.
Strictly adhere to the given report format:
The maximum page limit is 20 pages.
Strictly adhere to the given report format:
- Title Page, including names and roll nos. of all the group members.
- Contribution of authors: a truthful statement of the individual contribution of each group member.
- Summary, maximum length 400 words.
- Table of contents
- List of figures/tables (if any)
- Main text
- Perspective (your take on the future of the project topic and what could/should be done)
- References
Monday, 7 April 2014
Backlog quiz
Backlog students are required to appear for 1-2 quizzes of Env. Engg-1 course.
The topics to be covered include population forecasting and treatment process design.
The test will take place on 21 April, 2:15-3:00 pm.
The topics to be covered include population forecasting and treatment process design.
The test will take place on 21 April, 2:15-3:00 pm.
Saturday, 29 March 2014
M tech: IWM test schedule
IWM test on Apr 11, Lecture#6, 204 SET-2.
Duration~ 30 min. Topics have already been discussed in the class.
Duration~ 30 min. Topics have already been discussed in the class.
M Tech: IWM presentation Schedule (Textile Industry)
Here is the presentation schedule of IWM course for M Tech students :
Silk & Jute - Himanshu, Niraj
Date: Apr 3, Time: 3:00 pm..
Keep the presentation to 10-12 minutes. Also, submit the soft copy of presentation and a 4-5 page report.
Woolen mill- Bhanupriya,Sneha,Jeewan,Ankit, Akhlaquer
Rayon mill- Nadeem,Rahul,Rishabh,AvinashDate: Apr 3, Time: 3:00 pm..
Keep the presentation to 10-12 minutes. Also, submit the soft copy of presentation and a 4-5 page report.
Friday, 28 March 2014
Tuesday, 25 March 2014
B Tech/M Tech assignment submission guidelines
Here are a few guidelines for submission of your assignments and are applicable to both B Tech and M Tech students:
1) Assignments will only be accepted in the class during the lecture hour from the students who are present and are attending the lecture. If you are absent or late and are unable to attend the lecture, the assignment will not be accepted.
2) Late assignments (including after class, on the submission date) will be accepted only up to the end of next working day and will carry a penalty of 50% marks.
3) No assignments will be accepted after the next working day.
4) Hand-written assignments on ruled sheets or A4 paper only will be accepted. Assignments completed on diary pages or class copy pages will not be accepted.
1) Assignments will only be accepted in the class during the lecture hour from the students who are present and are attending the lecture. If you are absent or late and are unable to attend the lecture, the assignment will not be accepted.
2) Late assignments (including after class, on the submission date) will be accepted only up to the end of next working day and will carry a penalty of 50% marks.
3) No assignments will be accepted after the next working day.
4) Hand-written assignments on ruled sheets or A4 paper only will be accepted. Assignments completed on diary pages or class copy pages will not be accepted.
Friday, 21 March 2014
M Tech Batch (Nigeria)
M Tech Batch (Nigeria)
The New M Tech batch should bookmark the following blogs for their respective program's information:
Structural Engg.: http://mtsnigeria.blogspot.in/
Env. Engg.: http://mtenigeria.blogspot.in/
Information regarding the time table, courses and other announcements will be posted shortly on these blogs.
The New M Tech batch should bookmark the following blogs for their respective program's information:
Structural Engg.: http://mtsnigeria.blogspot.in/
Env. Engg.: http://mtenigeria.blogspot.in/
Information regarding the time table, courses and other announcements will be posted shortly on these blogs.
B Tech: Assignments (Regular and Backlog)
Assignments for Sec A and B and Backlog students can be accessed here. The due dates are mentioned in each assignment.
Assignment #1
Assignment #2
Assignment #3
Assignment #1
Assignment #2
Assignment #3
Friday, 14 March 2014
B/log MTE marks
Roll No. Marks (out of 20)
090107084 9
100107106 9
100107110 5
090107112 11
100107117 15
100107119 6
100107120 9
100107121 14
100107122 6
100107155 7
100107156 6
Thursday, 13 March 2014
M Tech: Projects
As course projects, M Tech students will work in 2 groups of 5-6 people and model the water quality of River Yamuna using QUAL2k. Limit your work to BOD of river water.
Group 1: Yamuna water quality in Delhi (use this for data: http://www.ipublishing.co.in/ijesarticles/thirteen/articles/volthree/EIJES31143.pdf)
Use 2012 data to predict the quality for 2015 and 2020, incorporating population increase.
Group 2: Yamuna water quality between Delhi and Agra (use this for data: http://www.cpcb.nic.in/newitems/11.pdf)
Use 2005 data to predict the quality for 2015 and 2020, incorporating population increase. You may also use the current census data.
Feel free to discuss it further with me.
You are expected to make presentations and submit final report around April 15-20.
You may find this link very useful for this exercise: http://www.usbr.gov/gp/ecao/wgfp_eis/stream_water_quality_modeling_report.pdf
Group 1: Yamuna water quality in Delhi (use this for data: http://www.ipublishing.co.in/ijesarticles/thirteen/articles/volthree/EIJES31143.pdf)
Use 2012 data to predict the quality for 2015 and 2020, incorporating population increase.
Group 2: Yamuna water quality between Delhi and Agra (use this for data: http://www.cpcb.nic.in/newitems/11.pdf)
Use 2005 data to predict the quality for 2015 and 2020, incorporating population increase. You may also use the current census data.
Feel free to discuss it further with me.
You are expected to make presentations and submit final report around April 15-20.
You may find this link very useful for this exercise: http://www.usbr.gov/gp/ecao/wgfp_eis/stream_water_quality_modeling_report.pdf
B tech: Projects
All the students are being assigned group projects as per their roll no. If you are not sure of your topic means, see me along with your entire group. You may also discuss the project with me, as per my availability. No topic change or group change requests will be entertained.
Each group will be required to submit a 15-page technical report on the assigned topic (around April 15). The format of the report will be provided to you at a later date. The schedule of presentations and report submission deadline will be provided in due time.
Each group will be required to submit a 15-page technical report on the assigned topic (around April 15). The format of the report will be provided to you at a later date. The schedule of presentations and report submission deadline will be provided in due time.
Thursday, 6 March 2014
M Tech: IWM MTE marks
Here are the marks of MTE for IWM course of MTech. You can view your evaluated answersheets till Wednesday, Mar 12.
MTE | |
Name | (20) |
Md Akhlaqur Rahman | 12 |
Mr Niraj Kumar | 12 |
Mr Himanshu Basik | 15 |
Mr Avinash Rajpoot | 11 |
Mr Rishabh Mohan Bhatnagar | 9 |
Mr Rahul Roy | 14 |
Mr. Jeevan Gaire | 16 |
Ms. Bhanupriya Sharma | 10 |
Mohd. Nadeem Khan | 10 |
Ankit Kumar Sahay | 14 |
Sneha Singh | 10 |
Nitin Yadav | Absent |
Friday, 28 February 2014
Thursday, 27 February 2014
Thursday, 20 February 2014
Monday, 20 January 2014
Subscribe to:
Posts (Atom)