This is the official Blog for all the courses taught by Prof. (Dr.) Gaurav Saini. Assignments, quizzes, attendance, notices and any other information for his courses will be posted here. This term (Odd Semester, 2020-2021), Dr. Gaurav is teaching Environmental Engineering-2, Environmental Chemistry & Biotechnology, and Renewable Energy Technologies.
Saturday, 27 August 2016
Test#1 next week (Aug 29-Sep 2)
Test# 1 will take place during the regular tutorial sessions this coming week (Aug 29-Sep 2). Unit-I will be the syllabus for the test.
You are all required to bring your own stationary (pen, paper, etc.) and scientific calculators. Use of cellphones is banned during the test.
You are all required to bring your own stationary (pen, paper, etc.) and scientific calculators. Use of cellphones is banned during the test.
Wednesday, 24 August 2016
Mass bunk by M Tech (Env Engg) students
M Tech (Env Engg) students did not show up for 7th lecture on Aug 24, 2016.
All the students have been marked absent and the topic of Water Quality (Unit-1 part-II) is deemed to be complete in-absentia.
All the students have been marked absent and the topic of Water Quality (Unit-1 part-II) is deemed to be complete in-absentia.
Friday, 19 August 2016
M Tech: RET: Assignment #1
Deadline: Sep 3, 2016
1. Figure out the following for 1 RE option (each student will select a different option):
a) The installed capacity patterns for last 3-4 decades and projected patterns for next 2-3 decades
b) Top 5 countries with maximum increase in RE option in past 2 decades and future 2 decades.
2. Figure out
a) What fraction of India’s installed capacity is delivered by Coal, Gas, Diesel, Nuclear, hydropower, Wind Power, Solar power and Bioenergy.
b) Future projected fractions (2030 & 2050)
1. Figure out the following for 1 RE option (each student will select a different option):
a) The installed capacity patterns for last 3-4 decades and projected patterns for next 2-3 decades
b) Top 5 countries with maximum increase in RE option in past 2 decades and future 2 decades.
2. Figure out
a) What fraction of India’s installed capacity is delivered by Coal, Gas, Diesel, Nuclear, hydropower, Wind Power, Solar power and Bioenergy.
b) Future projected fractions (2030 & 2050)
B Tech: EE-II Project List
The project list for the Env Engg-II course is available here.
The presentations will start from the week of Sep 5. Each week 2 groups from each section will make presentations. The schedule will be posted soon.