M Tech: RET: Assignment #1

Deadline: Sep 3, 2016


1. Figure out the following for 1 RE option (each student will select a different option):
a) The installed capacity patterns for last 3-4 decades and projected patterns for next 2-3 decades
b) Top 5 countries with maximum increase in RE option in past 2 decades and future 2 decades.

2. Figure out
a) What fraction of India’s installed capacity is delivered by Coal, Gas, Diesel, Nuclear, hydropower, Wind Power, Solar power and Bioenergy.
b) Future projected fractions (2030 & 2050)