Thursday, 24 November 2016

Leftover M Tech presentations

Leftover presentations of M Tech students will be held on Nov 25, 8:45-10:30 am.

Monday, 21 November 2016

M Tech: W & WWT: attached growth systems slides

Attached Growth Systems

B Tech: Classes of Sec C

Due to placement activities, classes of section 4C will not take place today.

Instead, the class will take place during Lecture#5 on Tuesday in Room 105. If need be, lecture#7 (room 104) may be used to finish the course.

You are all suggested to read through the design portion of the slides and bring the calculators.

B Tech: Test#6 for B-G2

Since the classes of 4th year are off today due to placement activities, the test#6 of B-G2 will take place during the scheduled lecture on Tuesday.

Wednesday, 16 November 2016

M Tech presentations: Week of Nov. 21

The presentations of M Tech courses will start on Monday, Nov. 21 and will continue during the assigned lecture hours.

The presentations of RET and W & WWT will be done on projectors. The students are also required to give an oral presentation on the assignment of Env biotechnology.


Each presentation will be of 10-15 minutes duration and the entire group needs to be present for the same. A common group report will also be submitted at the same time.

The oral presentation of Env Biotech assignment will be of 10 minutes duration and students will be required to talk about the treatment method and the process, on which they submitted the assignment.

The attendance of all the students in these presentations is highly recommended.

Friday, 11 November 2016

M Tech: ECB assignment

In groups of 3-4 students, pick one topic from each of the following Treatment and Processes:

Treatment (2-3 pages)
1. Bioremediation
2. Phytoremediation
3. Vermi-Composting

Process (1-2 pages)
1. Biotransformation
2. Biomonitoring
3. Fermentation

Discuss the following in the assignment: Definition/meaning, Mechanism, and a case study.

The deadline for submission is Friday, Nov. 18.


B Tech: Test# 6

Test# 6 will take place next week during the regular tutorial hours. The syllabus would cover wastewater conveyance unit (up to and including sewer materials).

M Tech: RET: Wind energy slides

Wind energy slides

B Tech: Wastewater Conveyance slides

Wastewater Conveyance Slides

Friday, 4 November 2016

B Tech: CA Projections

Dear students,

The attached sheet contains your projected CA scores, based on the tests and project presentations so far. You have 2 more tests to improve your CA and I would suggest very hard work for all of you.

Good luck

M Tech: Two Days workshop on “Hydro Power-Plant, Renewable Energy Certificate & Regulations

The Department of EEE, School of Engineering & Technology (SET) in partnership with National Power Training Institute (NPTI) is organizing Two Days Workshop on "Hydro Power-Plant, Renewable Energy Certificate, and Regulations" on 7th November 2016.

Energy sector appears to be getting substantial attention because energy is a requirement for social and economic development. But this energy sector contributes immensely to Green House Gases emissions and climate change. Hence there is now a renewed interest in the renewable sources of energy and because energy is a requirement for social and economic development. But this energy sector contributes immensely to Green House Gases emissions and climate change. Hence there is now a renewed interest in the renewable sources of energy and Hydro Power plant because they are considered low carbon estimates to fossil fuels.

This course will cover the basics of Hydro Power Plant and Renewable Energy and is a great introduction for those looking to make a career, or just want to learn more about energy from the sun, wind and water, energy efficiency and the basics of electricity.

Contacts for Registration:
  • Mr. S.P. Jaiswal - Assistant Professor, 882699812
  • Mr. Abhijeet Kumar - Assistant Professor, 8802927260
  • Mr. Shashank Singh - Assistant Professor, 8802541604
Date    : November 7, 2016 - November 8, 2016 
Time   : 1:00 pm - 4:00 pm
Venue : Auditorium 005, Block III, SET, Sharda University Plot No. 32-34, Knowledge Park III, Greater Noida - 201306

B Tech: Project Presentation schedule (Final)

Group-11 of sections B & C will make their project presentations on Thursday, Nov. 10 during lecture 7.

Anybody else who is yet to make his/her presentation can do so on Nov. 10 during lecture 8. After that there will be no presentations. This is your final chance.

Friday, 28 October 2016

New Schedule for Test#4 of C-G1

Classes for Nov 1, Tuesday, have been shifted to Saturday, Nov 5. The test has hence been postponed till the regular tutorial hour on Nov. 5.

Monday, 24 October 2016

Postponement of Test of C-G1

Due to Co-Qube test on Oct 25, the test#4 of C-G1 is being postponed to the next week. The test will now take place on Tuesday, Nov 1, during the regular tutorial hour.

The schedule for other groups remains unchanged.

B Tech: Test#4 this week

Test# 4 is taking place this week. It was already announced in the class last week and the syllabus includes ASP, oxidation ponds and ditches and trickling filters.

Tuesday, 18 October 2016

M Tech: RET: Assignment# 3

Design both stand-alone and grid-connected PV systems for your respective homes. You can use the same configurational parameters for each individual component (PV module, battery, Charge controller, etc.) as discussed in the class.

The last date of assignment submission is Friday, Oct 28.

M Tech: RET: Unit-II_3 slides

Unit-II_3 slides

Friday, 14 October 2016

M Tech: WWWT test next week

Test#3 will take place on Oct 21, lecture#2. The syllabus is Introduction unit of Wastewater Treatment.

M Tech: RET assignment# 2

Kindly go through the article titled "Enhancing renewable energy in India's Electricity Mix: A Paradigm Shift", published in TerraGreen by TERI..

The assignment involves following sections:

1. Discuss the authors' recommendations on increasing the fraction of RET in India's energy requirements. (Max length: 1 A4 sheet)

2. Do you agree or disagree with Authors' recommendations or any other aspect mentioned in the article? Can you suggest further recommendations to support or refute the authors' take on RET in India?  (Max length: 1 A4 sheet)


The due date is Friday, Oct 21.

B Tech: Project presentation Schedule

Groups 7 and 8 of sections B and C will make presentations on assigned topics on Thursday, Oct 20 as per the following schedule:

Lecture# 7: Sec C, Groups 7 and 8
Lecture# 8: Sec B, Groups 7 and 8

The report will also have to submitted then and there itself.

Wednesday, 12 October 2016

Showing the MTE answer sheets

The evaluated answer sheets of MTE will be shown during the respective Lecture hours ONLY.

No requests at other times will be entertained.

Saturday, 24 September 2016

B Tech: Test# 3 and Slides of Unit-III_1

Test# 3 will take place during the coming week and the syllabus is one section of Unit-III.

Slides-Unit-III_1

Tuesday, 20 September 2016

Test#2 for students who appeared for Capital Via test

As per the records obtained from Faizan Sir, the following 11 students attended the online test of Capital Via:


  1. Anuj Singh
  2. Danish Yousuf Wani
  3. Shubham Gaur
  4. Tatsam Yadav
  5. Vaibahv Sharma
  6. Abbas Raza
  7. Akhil Ahuja
  8. Anubhav Agarwal
  9. Rajat Yadav
  10. Shailesh Kumar Sharma
  11. Sufyan Ghani
The first 6 students will take their test along with G2 on Wednesday (Sep 21), while the remaining 5 will take the test along with B-G1 on Friday (Lecture 5).

Monday, 19 September 2016

B Tech: Presentation Schedule: Groups 5 & 6

The presentation schedule for Course Presentations for this week is as follows:

Sec C: G5 and G6: Thursday, Sep 29, Lec# 7: room 106
Sec B: G5 and G6: Thursday, Sep 29, Lec# 8: room 104


The presentation duration for each group is 15 minutes. Report will also have to be submitted at the time of presentation.

B Tech: Project presentation schedule

The presentation schedule for Course Presentations for this week is as follows:

Sec C: G3 and G4: Thursday, Sep 22, Lec# 7: room 106
Sec B: G3 and G4: Thursday, Sep 22, Lec# 8: room 104


The presentation duration for each group is 15 minutes. Report will also have to be submitted at the time of presentation.

Saturday, 17 September 2016

B Tech: Test# 2

Test#2 will take place in the week of Sep 19-Sep 23 and the Primary Treatment is the syllabus for it.

Tuesday, 13 September 2016

B Tech: Presentation Schedule: Sep 15, 2016

The presentation schedule for Course Presentations for this week is as follows:

Sec C: G1 and G2: Thursday, Sep 15, Lec# 7: room 106
Sec B: G1 and G2: Thursday, Sep 15, Lec# 8: room 104


The presentation duration for each group is 15 minutes. Report will also have to submitted at the time of presentation.

Monday, 12 September 2016

Saturday, 3 September 2016

B Tech: Course project presentations

The presentations for the course project will commence from the week of Sep. 12. Each week 2 groups from each section will present the project. A common project report of about 15-20 pages will also need to be submitted, at the time of presentation.

The project topics are all wastewater treatment techniques. You may want to include the history of technology/method, applicability, operational details, advantages and disadvantages, etc. You may also include any relevant case study.

The schedule of presentation will be posted in due course of time.

Saturday, 27 August 2016

B Tech: Unit-I slides

Unit- I

Test#1 next week (Aug 29-Sep 2)

Test# 1 will take place during the regular tutorial sessions this coming week (Aug 29-Sep 2). Unit-I will be the syllabus for the test.

You are all required to bring your own stationary (pen, paper, etc.) and scientific calculators. Use of cellphones is banned during the test.

Wednesday, 24 August 2016

Mass bunk by M Tech (Env Engg) students

M Tech (Env Engg) students did not show up for 7th lecture on Aug 24, 2016.

All the students have been marked absent and the topic of Water Quality (Unit-1 part-II) is deemed to be complete in-absentia.

Friday, 19 August 2016

M Tech: RET: Assignment #1

Deadline: Sep 3, 2016


1. Figure out the following for 1 RE option (each student will select a different option):
a) The installed capacity patterns for last 3-4 decades and projected patterns for next 2-3 decades
b) Top 5 countries with maximum increase in RE option in past 2 decades and future 2 decades.

2. Figure out
a) What fraction of India’s installed capacity is delivered by Coal, Gas, Diesel, Nuclear, hydropower, Wind Power, Solar power and Bioenergy.
b) Future projected fractions (2030 & 2050)

M Tech: RET: Unit-I slides

Unit-I slides

B Tech: EE-II Project List

The project list for the Env Engg-II course is available here.

The presentations will start from the week of Sep 5. Each week 2 groups from each section will make presentations. The schedule will be posted soon.


Monday, 25 April 2016

Sec C: Lab notebooks and viva

Lab notebooks will be evaluated during the regular lab hours. Group G1 will also have their viva during the lab hours.

Presentations

Any left over presentations will take place during the respective class lecture hours.

Tuesday, 19 April 2016

Test #6 schedule for next week

Test# 6 will take place during regular tutorial hours. The test will cover Mass-curve method.

Kindly note that all the students who attempt test#6 will be graded based on 4 best out of 6 tests. All other students will be evaluated based on 3 best out of 5.


Presentation schedule for next week, April 25-29

Sec B: Any remaining groups on Mon, during class lecture

Sec C: any remaining groups on Tue, during class lecture

EE Lab of Sec C-G1

EE Lab of Sec C, group G1 will take place on Friday, April 22, during lecture 4.

TDS and residual chlorine testing will be done.

Mass curve method slides

Mass curve method slides

Wednesday, 13 April 2016

Updated Project presentation schedule

Sec A: any remaining group: Fri, during class lecture

Sec B:
Grp. 7 & 9: Thursday, Apr 21, class lecture
Grp. 10 & 11: Friday, Apr 22, Class lecture

Sec C:
Grp. 8 & 9: Tue, Apr 19, Class lecture
Grp. 10 & 11: Thursday, Apr 21, class lecture

Updated Test schedule for C-G1 and A-G1

The test#5 of C-G1 ans A-G1 will take place as per the following schedule:

C-G1: Monday, 8th lecture, room #105
A-G1: Thursday, 1st lecture, room 205

Friday, 8 April 2016

Unit-IV Part-2 slides

Unit-IV Part-2 slides

Test #5 schedule

Test#5 will take place in the regular tutorial hours during the week of April 18-22.
It will cover unit-IV (transportation of water).

Project presentation schedule

Mon, April 11, Lecture 7: Sec A, groups 9 & 10
Mon, April 11, Lecture 8: Sec C, groups 4 & 5
Tue, April 12, Lecture 7: Sec B, Groups 8 & 9
Wed, April 13, Lecture 8: Sec C, groups 6 & 7


Friday, 1 April 2016

Urgent: 3C students to meet me urgently on Monday

The following students of 3C are required to me urgently on Monday before 9 am.

Md. Mubeen and Irfan Ali are also required to submit a passport size photograph each.

Ali Yaser
Md. Mubeen
Sudesh Bhandary
Bhagwan Pandeya
Gazala
Irfan Ali
RaviKant

Lab: Calculations for Alkalinity experiment

There seems to be some confusion about the calculations of Alkalinity test that is being performed this week.

Alkalinity in ppm (as CaCO3) = Volume of titrant used x N x 50 x1000 / Vol of sample

Here, N: normality of titrant = 0.1 N

Thus, alkalinity in ppm (as CaCO3) = Volume of titrant used x 5 x 1000 / Vol of sample

Also, if P: phenolphthalein alkalinity and T is total alkalinity, both calculated by using the above mentioned equations, then:

1) if T = 2P, Hydroxide alkalinity = bicarbonate alkalinity = 0, Carbonate alkalinity = 2P

2) if T < 2P: Hydroxide alkalinity = 2P-T, Carbonate = 2 (T-P), Bicarbonate = 0

3) if T > 2P: Hydroxide = 0, carbonate = 2P, bicarbonate = T-2P

Good luck with calculations.....

Thursday, 31 March 2016

Listed students to meet me urgently

Following students of 3C are required to meet me today itself with 1 passport size photograph.

Ali Yaser
Md. Mubeen
Sudesh Bhandary
Bhagwan Pandeya
Gazala
Irfan Ali
RaviKant

Tuesday, 29 March 2016

Lab notebook submission

All the students are required to submit completed and evaluated (signed by the respective lab-teacher) lab notebooks for Env. Engg. Lab by this friday, April 1. The notebooks are to be submitted to Mr. Anil in the EE Lab.

Poster Topics

From the posters received so far, I am surprised to see that few important water quality parameters such as "Chloride", "Solids" and "pH", etc.  are yet to get any attention from students. These would have been much easier to make, since we are already done with Chloride test in the lab and pH measurement is also familiar to all.


Sunday, 27 March 2016

Presentation schedule and test schedule

There will be no presentations or tests this week.

Tests will take in the week of April 4-8.

Presentation schedule will be posted soon.

Monday, 21 March 2016

Lab Chart/poster format

Dear All,

If you are yet to make your lab chart/poster, use the attached template. Just make the poster and save it as both a .docx and .pdf document and email it to me. I will get the printing done.

The size of the poster is 24" x 36". Do not use a font size of less than 24.

Make sure to add some images/pictures (only high quality images, of at least 1024 x 768 resolution).

For those of you who need live river data, visit the link: http://182.75.35.221/mowr/

Click on any of the stations and live streaming of data will start.

Send the poster to me by Mar 27. Bonus points for sending it to me by Tuesday, Mar 22 (50% for 2 pm submission) and Mar 25 (20%).

No submissions will be accepted beyond Mar 30.

I would suggest using Power-Point for making the poster and adjust the page size to 24" x 36" by using page-setup option (you may have to set it manually).

Saturday, 19 March 2016

no project presentation next week

In lieu of Holi, there will be no presentations next week.
We will continue the presentations, week after.

Friday, 18 March 2016

term paper synopsis review

All the term paper synopsis submitted to me have been reviewed. Those who submitted over email, should have received my reply. Those who submitted hard copies, can collect their synopsis with my comments, on any working day.

Sunday, 13 March 2016

Env Lab Posters by Section-C

Students of Section-C are required to prepare posters for environmental engineering lab, as was announced earlier. These constitute 15 marks of your CA.

The posters can be on any laboratory experiment within the general area of environmental engineering. They can also be on water treatment processes, such as coagulation, sedimentation, disinfection, softening, etc.

All the groups are required to show me the posters between Mar 28-30 and submit final posters (after corrections, if any) on Mar 31.

Duplication of topics is not allowed. A tentative listing of topics is:

Lab tests: Chloride, alkalinity, acidity, residual chlorine, Jar test, pH, solids, turbidity, hardness, BOD, COD, etc.

Processes: Sedimentation, Coagulation, Disinfection, softening, aeration, etc.

Good luck.

No Project presentation during the week of Mar 14-18

Due to the busy schedule of Mar 14-18, there will be no project presentation during the week.

Quiz schedule for week of Mar 14-18

Quiz will take place from Unit-III part-II during the regular tutorial hours, during the week of Mar 14-18.

Section A group G2 will have the test on Mar 21, during their tutorial lecture.

Friday, 4 March 2016

Project presentation schedule

The project presentation schedule for the week of Mar 7- Mar 11 is as follows:

Sec A: Groups 7 & 8: Tuesday, Mar 8, Lec 8
Sec B: Groups 5 & 6: Friday, Mar 11, Lec 7
Sec C: Groups 4 & 5: Friday, Mar 11, Lec 8

Tuesday, 1 March 2016

Students to meet Dr. Gaurav Saini urgently

Following students are required to meet Dr. Gaurav urgently.

Hillary G. Msheri
Irfan Ahmad Malik
Maweja K. Graje
Shahid Hassan Mir
Biniga Jacques
Ahmad Zaid
Arslan Khan Afridi
Geetanjali Ahirwal
Sunny Singh
Neeraj Chauhan
Mukul Chauhan
Nikhil Chauhan
Uddeshya Chauhan
Umar Javed
Wasiq
Yawer Shakeel
Yeye Babtunde Joshua
Rudy James Lama
Sheikh Shuaib


Friday, 26 February 2016

Updated: MTE marks attached

Here is an updated list of MTE marks for the sheets that have been evaluated so far. The sheet will be updated every day or so.

Project presentation schedule- Week of Feb 29- Mar 4

The project presentation schedule for the Week of Feb 29- Mar 4 is as follows:

Sec A: grp 5 & 6: Mon, Lec 8
Sec B: grp 3 & 4: Fri, Lec 7
Sec C: grp 3 & 4: Fri, Lec 8

Thursday, 18 February 2016

Discrepancy in class tests

It has come to my attention that a number of students are taking tests in different groups. For example, one student of Sec A-G2 tool the test with group G-1, without my prior permission.
Any such discrepancy would result in your test being canceled. This particular student's test has been canceled and he has been awarded a zero for the same.

If any such instance comes to my notice, you will be awarded a ZERO for being absent in your own group's test.


Friday, 12 February 2016

Revised test# 2 schedule for Sec B-G1

Sec B-G1 will have their test#2 on Mon, Lec 8, in room no. 105.
The syllabus will be unit-II part-2.

Project presentation schedule- Week of Feb 15-19

The project presentation schedule for the Week of Feb 15-19 is as follows:

Sec A: grp 3 & 4: Tue, Lec 8
Sec B: grp 1 & 2: Fri, Lec 7
Sec C: grp 1 & 2: Fri, Lec 8

Unit-III part-I slides

Unit-III part-I slides

Test schedule for Week of Feb 15-19

Test#3 will be conducted during the week of Feb 15-19, during the tutorial session for all the groups. The syllabus will include the portion of unit-III (Water treatment) that has been covered for the respective section.

Thursday, 11 February 2016

Test#2 for sec B, group G1

Test#2 of Sec B-G1 will take place on Feb 12 during their regular tutorial session.

Saturday, 6 February 2016

Project presentation schedule

The first two groups of each section will present a brief 15 minute group presentation and submit a 15-20 page report as per the following schedule:

Sec 3A: Tuesday, Lec 8
Sec 3B: Fri, Lec 7
Sec 3C: Fri, Lec 8


Tuesday, 2 February 2016

Postponing of project presentations till next week

The project presentations are being postponed to the week of Feb 7-12. The first two groups from each section will make presentation in that week.


Saturday, 30 January 2016

Project presentation next week

Groups 1 and 2 from each section should prepare their presentation (15 min duration) and report (max 15-20 pages) and be ready for presentations next week (Feb 1-5). The actual schedule of presentation will be posted on Monday.

Wednesday, 27 January 2016

Test #2 next week

A test will be conducted during the respective tutorial sessions, next week (Feb 1- Feb 5). The test will cover the part-2 of unit-II.

Thursday, 14 January 2016

Wednesday, 13 January 2016

Test next week

Next week (Jan 18-Jan 22) we will have the 1st test of the course. The test will be of about 20 min duration and will take place during the tutorial session for each individual group. The test will cover unit-I and first half of Unit-II.
Do bring your own stationary.